Right-Sizing Execution Guide
Our comprehensive right-sizing execution guide ensures seamless removal and installation of equipment. This guide serves as a general series of events that take place when we are hired to improve your production operations. From beginning to project completion and ongoing support, Tri-Logic is here to ensure your success.
Assessment
Mineral Rights Assessment
Determine what downsizing process is possible given the current mineral rights and ownership structure of the wells and if well streams can be commingled or kept independent of each other.
Review Current Flow Conditions
- Gas flow rate
- Oil and condensate flow rates
- Produced water flow rate
- Sand removal rate
- Flow line pressure
- Sales line pressure
Determine Optimal Site Layout
- Commingling options utilizing exiting equipment
- Downsizing options with low flow equipment
- Storage tank reductions
- Routing flow lines, dump lines, and sales lines
- Containment modifications
Equipment Analysis
- Separator sizing
- Heater sizing and burner management needs
- Flow line diameters and connections
- Dump line diameters and connections
- Sales line diameters and connections
- Measurement equipment sizing and connections
- I&E (instrumentation & electrical) / automation equipment
- Emissions equipment needs
Carbon Savings (Steel Manufacturing)
- Estimate potential carbon savings associated with the manufacturing of steel by right-sizing your facility
Planning
Profile Current Operating Conditions
- Heat
- Gas flow
- Liquid flow
- Pressure
New Low Flow Design Review
- Confirm vessel size is appropriate
- Verify inlet/outlet sizing for all accessories
- Ensure correct overall tie-in points
- Address heating and measurement needs
- Review I&E / automation requirements
- Identify ancillary environmental equipment
Pad Design
- Future pad footprint
- Drilling planning (initial and return-to-pad drilling)
- Safety optimization
- Reclamation considerations
- Future environmental equipment needs
Logistics
- Trucking
- Lifting equipment (e.g. crane, telehandler)
- Field labor
Emissions Considerations
- Pneumatic controllers audit
- Burner emissions audit
- Tank battery emissions audit
Redeployment Options
- Identify uses for equipment being removed
- Test or refurbish equipment remaining on location
- Sell surplus equipment
Implementation
Equipment Removal Process
- Lockout/tagout and de-energize equipment
- Flush equipment, associated plumbing, and remove free liquids
- Disconnect inlets, outlets, and I&E/automation accessories
- Facilitate crane and lifting operations
- Dispatch trucking services for equipment removal
Refurbishment & Disposition Options
- Test and inspect onsite
- Light refurbishment onsite
- Full refurbishment in Tri-Logic’s shop
- Sell used equipment to Tri-Logic
New Low Flow Facility Installation
- Civil rework, facility plumbing, and containment modifications
- Remove unnecessary equipment and set new equipment
- Replumb and torque inlets and outlets
- Reattach or install I&E/automation accessories
- Test right-sized facility
- Isolate and hydrotest to customer specs
- Dewater and dry the system
- Purge and pressure up with wellhead gas in steps (checking for leaks)
- Function test all equipment and safety devices
Final Commissioning
- Final function tests of all systems
- Verification of safety devices
- System handover ready for optimized production
Support
Ready to increase pad profitability?
Contact us to get started.